In Service: 4 March 1939 to 13 April 1940
Ordered:
Builder: F.
Krupp Germaniawerft AG, Kiel
Construction No: 538
Laid down: 3 May 1935
Launched: 12 March 1937
Commissioned: 4 March 1939
Type: Destroyer / Zerstörer
Class: Zerstörer 1934A
Displacement: 2,270 tons standard 3,190 tons full load
Length: 120 m
Beam: 11.3 m
Draft: 4.23 m
Propulsion: 2 × shafts 2 × Wagner geared
turbines
Power: 70,000 shp
Propellers:
Speed: 38.7 knots
Range: 1,825 nautical miles at 19 knots
Crew: 325 men and officers
Armament:
5 × 12.7 cm L/45 SK C/34
carried 600 rounds
4 × 3.7 cm L/83 SK C/30
carried 8000 rounds
6 × 2 cm MG L/65 C/30
carried 12000 rounds
8 × 2 cm MG L/65 C/30 after mid 1942
carried 16000 rounds
8 × 53.3 cm torpedo tubes
8 torpedo's carried
4 × depth charge launchers
60 mines
Armour
Aircraft:
Variants:
Other: Destroyers
Articles:
Downloads:
Film Footage:
4 March 1939
The destroyer Erich Giese is commissioned.
8 April 1940
The destroyer Erich Giese takes part in operation Weser�bung
(Invasion of Denmark and Norway) along with Anton Schmitt,
Wilhlem Heidkamp, Diether von Roeder, Georg Thiele, Erich
Koellner, Bernd von Arnim, Hans Lüdemann, Hermann Künne
and Wolfgang Zenker.
13 April 1940
The destroyer Erich Giese is sunk by six British destroyers.
83 crew lost. Position 68° 24.5N 17° 39E.
Karl
Smidt
Takes command on March 1939
Ends command on March 1940
German Warships, 1815-1945: Major Surface Vessels.
ISBN-10: 0851775330
German Warships, 1815-1945: U-boats and Mine Warfare Vessels.
ISBN-10: 155750301X
German warships of the Second World War.
ISBN-10: 0668040378
For a complete list of
sources